§ 605. Powers and duties
Cite as: 27 CNCA § 605
A. The EPC is empowered to promulgate rules, require and issue permits, and issue orders:
1. applicable to the permitting, posting of security, construction, operation, closure, maintenance and remediation of solid waste disposal sites, borrow pits and dredge and fill areas;
2. establishing requirements for disposal, transfer, transport, treatment and storage of solid waste in ways that ensure public health and safety and protection of the environment to the greatest extent possible;
3. encouraging or requiring methods of pollution prevention, waste reduction, conservation, avoidance, minimization or mitigation of impacts, and recycling;
4. requiring sampling or the submission of laboratory reports or analyses performed by certified laboratories for the purposes of compliance monitoring and testing, and for other purposes required for the regulation of sludge;
5. requiring the submission by any applicant, owner or operator of a solid waste facility of detailed site plans, compliance audits, environmental assessments or other reports prepared by an engineer or qualified consulting firm approved by the EPC, as a condition of granting a permit or allowing continued operations, and as a requirement in any order or consent agreement;
6. requiring disclosure of information and filing of reports by any owner, operator or applicant, and requiring certifications or licenses for operators;
7. addressing the transportation of solid waste. Such rules shall not be less stringent than those of the United States Department of Transportation or the United States Interstate Commerce Commission;
8. regulating borrow and storage areas for soils, and storage of chemicals or other materials;
9. developing comprehensive solid waste management rules and best management practices;
10. overseeing development of a nationwide integrated solid waste management plan with input from the public, other tribes, states, municipal and county governments and regional solid waste planning and management entities;
11. establishing administrative permit and enforcement procedures;
12. establishing standards and requirements for the remediation of groundwater, surface waters, or contaminated soils resulting from releases, spills or any other activity;
13. implementing and enforcing provisions of the Solid Waste Code and applicable regulations pursuant to Chapter 12 of the Cherokee Nation Environmental Quality Code; and
14. enforcing the provisions of applicable federal laws and regulations including, but not limited to, those related to landfills in 40 C.F.R. Part 258.
B. The EPC may establish by rule a schedule of fees to be charged for copies, applications for permits, licenses and other authorizations, inspections and other environmental services involved in the regulation of solid waste. Fees charged pursuant to this section shall be paid into the Environmental Quality Revolving Fund. The EPC in setting fees shall consider appropriate factors such as facility size and capability, type of facility and type and amount of waste accepted, stored, treated, transferred or disposed.
C. The EPC may, but is not obligated to, authorize a variance from specific requirements if the applicant demonstrates that compliance will be met by substituted technology which equals or exceeds the protection otherwise accorded and the variance will not result in a hazard to the health, environment and safety of the people of this Nation or their property. Any variance shall be upon express condition that, in the event of the failure of the substituted technology to conform to requirements, the applicant shall be required to incorporate the technology, process or procedure established under the rules.
Historical Data
LA 15–05, eff. April 20, 2005. Renumbered from 63 CNCA § 605.